The centre asked us to look at a new stormwater system for its outdoor play areas, where the walkways run beside sandy play spaces.
Craig inspected the outdoor areas and sent a quote for the new stormwater work in October 2025. The quote was approved in March 2026, and Craig was back on site on 17 March.
The work covered the walkways along the verandah, the play area by the steps and the western side of the outdoor area, where a pit needed replacing and the ground levels needed adjusting so water would run to it.
Heel Guard Grates for Walkways Around a Play Area
Heel guard grates have narrow slots, which suit paths that people walk along every day. We used galvanised heel guard trench grates along the walkways.