School Plumbing Maintenance at Meriden School, Strathfield
Over one month the school needed 13 separate plumbing jobs, from a blocked sewer to a shower that would not stop running.
The job was opened and approved on 29 January 2026. Every plumbing job after that was logged against the same job record, with the date and the building, and most with the crew who attended.
That gave the school one record and one invoice for the month.
School Plumbing Jobs With Site Instructions
Some jobs came with instructions from the school. For the senior school girls' shower near the pool, the instruction was to check in with the health centre staff before entering.