New Bubbler Station Plumbing at Engadine Leisure Centre
An old blue bubbler near the pool was being replaced by a new bubbler station behind a bench seat, with wheelchair access and a slab level with the path.
The site plan was marked up on 9 March 2026, and the quote was approved the same day. The new station needed a water supply, a drain and a concrete slab finished at the same level as the existing path.
All of it sat in the grounds of a public pool, so the work areas were fenced off.
Bubbler Plumbing Set Out to the Plan
The bubbler base was installed to the set-out distances on the plan, and the finished concrete level matches the existing path.